Before start-up – Инструкция по эксплуатации Sulky Easydrill W

Страница 12

Advertising
background image

Before start-up

GB

Recommendations for use

A

When drilling, it is absolutely essential to lift the machine up
when turning in the field.
It is not advisable to turn too tightly when drilling.

Sulky cannot be held liable in any way in the event of an
accident arising due to the use of the machine that does not
comply with the instructions.

The presence of stones, rocks, stumps or other
obstacles must be taken into account.
The drill must be driven appropriately.

The operating speed for minimum tillage drilling
must not exceed 12 km/h. The operating speed
when drilling directly and in plots where there is
vegetative cover must not exceed 8 km/h.

Variations in the results of drilling and plant
emergence cannot be completely excluded in spite
of the care taken by Sulky in the design and
manufacture of this seed drill, even when it is used
in full compliance with the instructions.

The factors that may have an impact on the
success of direct and minimum tillage drilling are
very varied, and include:

- Seed quality (coatings, treatments, density,

vigour, germination rate, etc.)

- Problems with the structure or heterogeneity of

the soil, presence of pests (slugs, field mice).

Minimum tillage drilling requires a high level of
agronomic knowledge.

The EASYDRILL seed drill has been designed and
constructed for drilling all kinds of commonly used
seeds in a variety of different situations.

Nevertheless, it is essential to follow the
manufacturer’s recommendations and to work
carefully and sensibly.

It must be used only by skilled and trained
operators.

It is possible that there will be occasions where the
ground is either too wet or too dry to use the drill
properly.

In some of these difficult conditions, using your drill
may result in damage to the machinery or to the soil.
Sulky cannot be held responsible for damage
caused by improper use of the machine.

Any modification to the machine carried out
without Sulky’s approval will automatically
invalidate the manufacturer’s guarantee.

Minimum tillage drilling must be carried out on
level, firmly consolidated ground where the harvest
residues have been properly incorporated
beforehand.

Advertising