Инструкция по эксплуатации Kastor KSIS Wood-burning sauna stoves

Страница 29

Advertising
background image

29 / 54

Remove the frame from the screws at the sides by lifting upwards and then pulling it
forward off the screws.

Pull the feed door frame off the connecting part.

Make a hole in the wall sized 440mm (width) x 560mm (height) to ensure that there is
20mm of space for fire wool on all sides of the extended feed door.

Remember to

account in your height calculations for the height of any protective layer the stove

might be standing on and add for instance 60mm to the height of the hole from the

ground.

Install the stove into its place on the sauna side. Install the extensible feed door frame so
that it extends 5cm further than the wall's thickness (this makes attaching the frame in the
other room easy).

Insulate the gap between feed door and wall with fireproof mineral wool.

Follow the

instructions of the mineral wool manufacturer!

Install the covering frame into place with its screws.

Tighten the screws so that the covering frame's lower edge is near the floor.

Push the feed door frame so that the covering frame settles well into place against the wall.

Remember to retain the stove's safety distances according to chapter 2.3.

Attach the feed door frame's locking screws. These are located within the frame on both
sides (2 screws).

Attach and centre the ash box's front side protective piping located at the front, low in the
middle (screw).

Extend the ash box to a suitable length using an extension piece. The proper size is
10mm shorter than the stove's internal depth as measured from the front to the back wall.
Attachment from the ash box's outside using 3 screws.

2.1.2 WATER TANK

Water tank cover
Lift off the water tank cover (remove protective plastic sheeting from the cover) and attach the
cover's handle knob with a screw in such a way that the knob is on the outside.

Water tank spout
To avoid damage during transport, the spout of the stove's water tank has been installed on the
inside. The delivery includes the spout, two gaskets and a nut. The spout should be attached on
the exterior of the water tank as follows (Picture 1):

Lift water tank from its place.

Place first gasket on the spout's winding.

Push spout into hole in the stove's mantle.

The second gasket is placed on the spout's winding on the inside of the mantle.

Lift water tank into its place and set its hole on the winding part of the spout.

Set the water tank's edge on the side support.

Place the nut on the spout's windings inside the tank and tighten with suitable tool.

2.2. Stones and their arrangement

Use peridotite or dunite or darkish natural stones with diameters of over 10 cm. always wash the
stones before installing them. They must not be stacked too tight or heaped up – arrange them
so that plenty of air can pass between them to warm the upper stones, as well. Fill the stone
compartment up to the edge, with flat stones in upright positions (Picture 2.2.). The maximum
stone capacity is about 60kg.

By adjusting stone size, amount and adding other types of stone you can balance the steam consistency to
suit the sauna and your preferences. Since these are highly individual, we cannot give a general rule of

Advertising